Circored® Process

Reduction gas heaters for the Circored® process

The direct reduced iron is produced in an two-stage reactor consisting of a circulating and a stationary fluidised bed. Hydrogen is used as the reduction gas

Contact
Tel: +49.89.7447.47 - 0
Fax: +49.89.7447.47 - 17
  E-mail:
selas-linde@linde-le.com

Plants completed
1995 - today   SL has supplied 3 reduction gas furnaces for the first large-scale plant using this process

Performance features
Volume flow
reduction gas:
  so far, up to 173,000 Nm³/h
Product outlet temperature:   700 - 884°C
Absorbed output:   8,8 - 19,2 MW
Efficiency:   > 90% possible
NOx Emissions:   < 300 mg/Nm³
Delivery time:   < 12 - 14 months (delivery FOB)
< 20 months (mechanical completion)

Plant features
Optimised use of energy:   through air preheater temperatures up to 740°C
Product-side pressure losses:   < 15 kPa at 193,000 Nm³/h
Bottom and side wall firing possible:    
Process optimisation:   Quadrupling the first large-scale plant