Upgrades and Repairs

Upgrades (modernisations) and repairs are a further aspect of the services provided by SELAS-LINDE. In particular, upgrades are particularly important, since only partial components are replaced here, which means that both investment and reconstruction times are kept to a minimum.

The upgrades are generally coupled with improved performance and lower levels of energy consumption. Emission levels are reduced through the use of modern low-NOx burners. The potential for improvement is based on a precise analysis of the existing data and operating parameters.

SELAS-LINDE choose suitable suppliers and experienced installation companies, which means that the workload for the customer on site is considerably reduced. Precise scheduling combined with professional project management ensures revamp is completed on time.

Contact
Tel: +49.89.7447.47 - 0
Fax: +49.89.7447.47 - 17
  E-Mail:
selas-linde@linde-le.com

Plants completed:
Over 150 upgrades and repairs have been completed by Selas Linde

Scope of work:
Subsequent calculation of the furnace plant in terms of process engineering
Mechanical calculation of the furnace components
Assessing and evaluating the incombustible materials to determine whether it should continue to be used or be replaced
Assessing and evaluating the coils and bundles to determine whether they should continue to be used or be replaced
Assessing and evaluating the burner and blower to determine whether they should continue to be used or be replaced including preparing proposals for improving the system, e.g. changing to low-NOx firing
Assessing and evaluating the heat exchangers whether they should continue to be used or be replaced
Preparing documents for calls to tender
Awarding contracts for goods and services
Quality monitoring, deadline planning and supervision of work
Site supervision

Selected references:
DOW, Böhlen
(Germany)
  Refurbishment of an ethylene cracking furnace: partial renewal of convection zone, installation of additional soot blowers, 1996
BOREALIS, Sines (Portugal)   Refurbishment of two ethylene cracking furnaces: new radiation zone coils, repair: incombustible lining and steel walls, burner to low-NOx operation, replacement of quench coolers, 1998 & 1999
OMV, Schwechat
(Austria )
  Refurbishment of two ethylene cracking furnaces: complete replacement of convection zone, 1999 & 2000
VEBA, Scholven (Germany)   New radiation zone coil, repair of incombustible lining and steel walls, 2001
DOW, Böhlen
(Germany
  Refurbishment of an ethylene cracking furnace: complete replacement of convection and radiation zone with burners, 2002
DEA, Wesseling (Germany)   Refurbishment of a xylol heater: increased capacity by renewal of convection zone and burners, 1992
SOLVAY, Tavaux (France)   Refurbishment of an EDC cracking furnace: increased capacity through refurbishment of convection zone, 2000
HOECHST,
Frankfurt a. M. (Germany)
  Refurbishment of two ketene furnace, renewal of tube bundles in radiation zone and convection zone after 30 years' operation, 2000/2002
LINDE GAS, Milazzo (Italy)   Refurbishment of s steam reformer: increased capacity through modification of steam drums and blowers, 2003
VEBA OEL, Scholven (Germany)   Refurbishment of a Visbreaker: increased capacity through replacement of tube bundles in radiation zone and convection zone, reduced emissions through replacement of burner, 1989